Installation
Installing your Investment
Home → BioCycle → Installation
Installation of Wastewater Systems
There are several components that need to be identified for installation purposes:
1. Installation of the collection system from the serviced facility to the Biocycle plant.
2. Installation of the Biocycle plant.
3. Installation of the transport line from the BioCycle plant to the dispersal field.
4. Installation of the Dispersal field.
5. Installation of other components that will impact the sewerage system such as drainage ditches or interceptor drains.
Each of the above noted steps need to be completed by a qualified installer or under the supervision of a qualified installer. Remember to "interview" your prospective installer to ensure that he has the experience and access to the proper equipment to complete your job professionally, safely and in a timely manner. While "interviewing" remember that nobody has x-ray vision and therefore can't see through the soil for items of potential hazards such as subsurface water, bedrock or unreported gas/electrical lines.